Specialist advice for Hinkley Point C new nuclear development
Supporting discharge of marine licence conditions and Development Consent Order requirements
Learn moreDungeness B Nuclear Power Station, on the coast of Kent, is in its decommissioning phase. As part of the defueling process, the main cooling water pumps are planned to be switched off, which will significantly reduce the dilution of trade effluents (liquid waste) prior to discharge into the marine environment.
Operator EDF Energy commissioned ABPmer to produce Environmental Risk Assessments to determine the potential environmental impact of the change in effluent dilution. Our initial Risk Assessment focussed on total residual oxidant (TRO), a measure of the residual biocide concentration within the cooling water, while the second considered TRO alongside other primary waste streams.
To inform the initial Risk Assessment, we:
Our assessment considered the size of the predicted mixing zone for TRO concentration against Environmental Quality Standards (EQS) values as per the Water Framework Directive.
To inform the Risk Assessment for the remaining waste streams:
It was concluded that, due to dispersion characteristics, the small volumes and short duration of the discharges, and the infrequency of discharge, the environmental risks of the waste streams was negligible.
Image courtesy EDF Energy
ABPmer’s planning and consents specialists regularly prepare environmental statements and support developers through the minefield of marine consents.
Discover what our consents and licensing services can do for you.
Supporting discharge of marine licence conditions and Development Consent Order requirements
Learn moreABPmer's specialist input supported the application for a proposed NuGen power station in West Cumbria
Learn moreSupporting the installation of a water cooling system for the Grangemouth Renewable Energy Plant
Learn more